| IOP |
Date |
Science Objectives |
Begin (UTC) |
End (UTC) |
Dropsonde Mission |
Catalog Products |
Report Summary |
Comments |
| IOP-1 |
19-22 May |
Frontal circulation
Upstream environment for orographic convection
Model verification and data assimilation
|
19 May 06:00 |
22 May 00:00 |
mission #1 at 21Z May 20, C, 3:20/12-4 |
Operational
Research
Model
|
|
SOP started on 00Z May 15 and scheduled to end on 00Z June 25 |
| IOP-2 |
27-29 May |
Southwest flow interacting with the terrain
Upstream condition for mountain convection
Lee side vortex/shear zone
|
27 May 06:00 |
29 May 21:00 |
mission #2 at 21Z May 28, D, 2:35/13-6 |
Operational
Research
Model
|
|
Non-IOP convective systemsˇ¦ microphysics study (May 22-26) |
| IOP-3 |
29-31 May |
Island effects on SW (LLJ) and the Mei-Yu front
Upstream condition forheavy precipitation |
29 May 21:00 |
31 May 21:00 |
mission #3 at 21Z May 29, Cn, 2:43/15-10 mission #4 at 21Z May 30, Cn, 2:55/ 13?0 |
Operational
Research
Model
|
|
EOP started on 21Z May 29 |
| IOP-4 |
01-03 Jun |
Mesoscale convective systems
Shallow surface front
Mesoscale convective vortex |
01 Jun 21:00 |
03 Jun 15:00 |
mission #5 at 09Z June 3, Cn, 2:29/13-0 |
Operational
Research
Model
|
|
Astra nose radar malfunction, the flight was delayed. |
| IOP-5 |
03-04 Jun |
Mesoscale convective systems
Quasi-stationary front
Mesoscale convective vortex |
03 Jun 18:00 |
04 Jun 12:00 |
mission #6, 21Z June 3, C, 3:47/14-2 mission #7, 05Z June 4, E, 2:08/12-0 |
Operational
Research
Model
|
|
|
| IOP-6 |
04-06 Jun |
Mesoscale convective systems
Quasi-stationary front
Mesoscale convective vortex |
04 Jun 18:00 |
06 Jun 12:00 |
mission #8, 21Z June 4, C, 3:25/15-1 mission #9, 05Z June 5, E, 2:23/10-0 mission #10, 21Z June 5, D, 2:35/12-1 |
Operational
Research
Model
|
|
MCV landed and brought heavy rainfall to Kaohsiung. |
| IOP-7 |
12-13 Jun |
Convection initiation
Orographic convection |
12 Jun 00:00 |
13 Jun 12:00 |
UAV mission #1, 04Z and 06Z June 12 |
Operational
Research
Model
|
|
Astra engine oil leakage and grounded for a few days |
| IOP-8 |
14-17 Jun |
Southwesterly flow interacting with the terrain
Upstream condition for mountain convection, low level jet
Mesoscale convective systems
Mesoscale convective vortex |
14 Jun 00:00 |
17 Jun 12:00 |
mission #11, 09Z June 16, E, 2:15/10-1 mission #12, 21Z June 16, E, 2:25/12-0 mission #13, 04Z June 17, E, 2:29/14-1 |
Operational
Research
Model
|
|
Astra available after examining by Singapore engineer |
| IOP-9 |
23-26 Jun |
Typhoon Fengseng track uncertainty
Typhoon induced southwesterly flow and related heavy rain systems |
23 Jun 06:00 |
26 Jun 12:00 |
mission #14 at 08Z June 23, Dotstar flight, 2:30 mission #15 at 09Z June 25, E, 2:30/ 15 |
Operational
Research
Model
|
|
SOP ends on 12Z June 26
#14 is the coordinated flight with DOTSTAR on 08-10Z June 23
|